SM-CAMPAIGNS-01 — R2.2 Integrated Design

One interactive Campaign prototype on the Y2 Sequence Atelier visual foundation, with Y1 operational diagnostics for Active/Paused and Y3 compact numerical presentation. Behavioral corrections N-1–N-7 from Muse’s R2.1 Independent Regression Report.

Open integrated prototype Complete lifecycle-adaptive Campaign journey (simulated). No application code.

Preview version: SM-CAMPAIGNS-01 R2.2 · Isolated design prototype · Simulated interactions only
Review: REVIEW_INSTRUCTIONS.md · Limitations: TECHNICAL_LIMITATIONS.md · Manifest: DEPLOY_META.json
R2.1 remains at its prior Cloudflare deployment URL (see DEPLOY_META.json prior_r21_deployment_url).